Coordination Plan
The Federal Highway Administration (FHWA), Texas Department of Transportation (TxDOT) and the Alamo RMA are soliciting comments from the public and from participating and cooperating agencies regarding the need and purpose for the proposed project, project alternatives, methods to be used in evaluating the project alternatives, and the level of detail required in the analysis of each project alternative.
This Coordination Plan describes the roles of the lead agency, joint lead agencies, and the cooperating and participating agencies. All of these Agencies are indentified in the Coordination Plan.
| US 281 EIS Coordination Plan | File Download | ||
|---|---|---|---|
| US 281 EIS Coordination Plan | Download | ||





